RE: [EnergyPlus_Support] LEED compliance modeling.





Dear Phyl,

 

·         I use DesignBuilder for the geometry and materials generation.

·         I keep a library of E+ IDF info for each ASHRAE 90.1 baseline system, and then edit it to suit using a spreadsheet template which aids in adding zones and creating node and system names that are easily understood.

·         For the “proposed” systems, I modify the DesignBuilder model to get materials consistent with the actual design, then create the new HVAC systems (often using previously-created systems as a starting point)

 

I think you’re well advised to think about the work flow!  Recently, I’ve been doing way too much backtracking and revising of models because I was not careful while preparing the initial model.

 

On a related note, one of my current clients did not get actual equipment sizes nailed down until about 3 days before construction documents release for bids … and I was supposed to have the “proposed” systems modeled a week later.  Didn’t quite make it.

 

You can waste a LOT of time by doing the work with incomplete information or by not paying attention to the efficiency of the process.  I’ve started a manual to guide my efforts and other BPT people so we “git ‘er done” with high quality and as fast as possible, but it still needs a lot of work.

 

 

The Building Performance Team
James V. Dirkes II, P.E., LEED AP
1631 Acacia Drive NW
Grand Rapids, MI 49504
616 450 8653

 

From: EnergyPlus_Support@xxxxxxxxxxxxxxx [mailto:EnergyPlus_Support@xxxxxxxxxxxxxxx] On Behalf Of Phylroy Lopez
Sent: Wednesday, September 01, 2010 4:07 PM
To: EnergyPlus_Support@xxxxxxxxxxxxxxx
Subject: [EnergyPlus_Support] LEED compliance modeling.

 

 

I am wondering what kind of workflow is used for LEED compliance modeling.   Do people simply use the e+ online example wizard to help start the a90.1 reference building and then modify it to the actual specs.  Then use that new baseline to create the proposed model.  

 

Or do they build the proposed building from scratch and then build reference building by hand and using openstudio.  

 

Thanks in advance.

 

Phyl



__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___