[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [EnergyPlus_Support] Default zone loads in Openstudio





The lighting and equipment loads are zero because this is the worse scenario to heating (HVAC). And you should model the HVAC to this scenario.

Ricciano.

2011/6/16 Linda Lawrie <linda@xxxxxxxxxxxxxx>
 

Sounds like a question to ask the OpenStudio forum.



At 11:27 AM 6/16/2011, Rohit Kadam wrote:


Hi all,

 I am using OpenStudio to create a building model and then run it in EnergyPlus. For applying the zone loads I used the Default office option in OpenStudio but I have certain questions in the loads like for winter design day the lighting and equipment load was 0 "zero" for all 24 hours in default office selection. I don't understand why these loads are zero in winter.

Also I need to know how are the loads in default office allotted (i.e. the calculation for that).

 Thank you
regards
Rohit





--

Att,


--
Ricciano Liberali
 
Cel:55 51 81281500

www.petinelli.com

Petinelli Inc.
A Green Building Solutions Company
Rua General Carneiro 638, Alto da Gloria
Curitiba - PR  80060-150  BRAZIL




__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___