Re: [EnergyPlus_Support] Summer Design Day Simulation questions





At 07:37 AM 7/10/2011, Jean marais wrote:
1) is the People schedule overridden to 1 for the entire non-zero times?

No, shouln't be.

2) is the same true for other internal loads such as lights? Only during occupied times?

Same.

3) does the wind vary? What wind is used?

I believe the wind is constant but would have to report it out to make sure.

4) if the system has heat recovery, is there anything to consider?

Same as there would be for summer weather days.

However, note that the default design days have a type of "SummerDesignDay", "WinterDesignDay" and act according to the schedules that are on those days.

If you want to know for sure on any of those questions about, use Output:Variables for the appropriate items.

Linda


__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___