Hello,
I have attached an IDF,which I created few
days back. I am a beginner with E+. I wanted
to check if I have done it properly or not.
There are no errors on running the
simulation. There are a few warnings which
come up since I have not used all day types,
I think. However I assume that this does not
affect my simulation results. Please go
through and let me know if its correct.
Coming to what I want: I need to run a
simulation for a 3 bedroom house. I assumed
it to be under a single zone, since only one
thermostat is to be used to regulate the
temperature throughout the house. Firstly is
this assumption correct?
Next, I have PTAC with electric heating
coil. Is this enough for performing both
heating and cooling? Also please look into
the output. I find that during winter, at
certain time of the day, cooling occurs
which sounds not correct. Can you kindly
explain why? Am I making a mistake in the
scheduling?
Please verify my file and if changes are to
be made, please help me out with it.
I had emailed earlier inquiring about this
and got few replies. However I did not
understand them very clearly. So here it is
again: I need the HVAC to cut off on
reaching the cooling or heating set point.
In other words, I do not want the HVAC to be
running continuously and trying to maintain
the set point. Zone/room temp = set point,
HVAC should turn off. Then once the
room/zone temperature rises or falls by 1
deg C, I want the HVAC to once again kick
ON to cool or heat the room. And I want the
heating and cooling to be electric. This is
what we normally observe in our houses. So
basically, it will be a cycle of cooling in
case of summer and a cycle of heating in
winter. Can this be done in E+, if so, can
you explain in detail how to do this. It
will be really helpful, since I am working
on my thesis based on this. In of the
replies which i had got earlier, I was asked
to look into the part load ratio and I was
told that the HVAC operation is
dependent on the load and is not about
reaching the set point. It makes sense and I
agree speaking technically, but with this
software, how do I get to the part load
ratio?
Once again I request you to go through the
IDF and verify if its correct and suggest
modifications to improve it or in case its
wrong help me correct it. Also please
explain in detail on how to go about to
achieve the HVAC operation like I have
mentioned.
Sincerely,
Aditya