Dear Forums, A recent discussion with a colleague has made me question my understanding of the proper way to model an HVAC system when humidity control is a project criteria. Imagine a building in South Florida that requires the space humidity not to exceed 55% RH. 1. The building might use Baseline system #4 (heat pump with electric supplemental heating). I have modeled that in the past simply as a normal heat pump with sub-cool + electric reheat for humidity control. 2. Another possibility is a System #5 or #6 (VAV fan with VAV or PFP boxes and reheat). The question is this: 90.1 has restrictions on the amount of air that may be reheated (It’s the greater of 0.4 cfm / sq.ft. or 30% of the peak airflow rate plus a few other items). These are noted in Section 6.5. Appendix G, however, does not reference the requirements of Section 6.5 anywhere (that I can see). Do they apply to a Baseline energy model? Thanks for your input! Making me think…. Seek truth while you are young, for if you do not, it will later escape your grasp |