When running a many locations it is easiest to use the object called:"sizing period weather file condition type"
Name Summer Extreme Weather File Winter Extreme Weather File Period Selection SummerExtreme WinterExtreme Day of Week for Start Day Monday Monday Use Weather File Daylight Saving Period Yes Yes Use Weather File Rain and Snow Indicators Yes Yes Jeremiah D. Crossett | Senior Analyst | Phase Change Energy Solutions120 E. Pritchard St. | Asheboro, NC 27203 | Mobile 503-688-8951
On Tue, Sep 4, 2012 at 4:33 PM, cmcdona037 <mcdonald.cliff@xxxxxxxxx> wrote:Hello,
I'm new at EnergyPlus, but do have some experience with DOE-2.. I'm trying to take the PNNL prototype models and run the for some different locations. Since the HVAC and Plant equipment is set to autosize, I was hoping that I would only have to change the weather file and I'd be good to go. However, after some digging it does seem that there are a few inputs I have to change in the IDF, mainly the sizingperiod:designdays. Are there any other inputs i need to change to get an accurate run in different locations? Is there a general procedure I can follow to update the model for a different location?
thanks,
-cliff.