[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[EnergyPlus_Support] Unanticipated Error of Dual Set Point with Deadband





Dear All,

I got severe error below on one of the zone although the other zones has the same setting. Could any one kindly advise.

   ** Severe  ** DualSetPointWithDeadBand: Unanticipated combination of heating and cooling loads - report to EnergyPlus Development Team
   **   ~~~   ** occurs in Zone=BASEMENT02:B2%PLANTROOMS During Warmup & Sizing, Environment=SUMMER DESIGN DAY IN KUWAIT INTERNATIONAL AIRPORT TERMINAL II, at Simulation time=07/15 09:01 - 09:02
   **   ~~~   ** LoadToHeatingSetPoint=NAN, LoadToCoolingSetPoint=NAN
   **   ~~~   ** Zone Heating Set-point=22.00
   **   ~~~   ** Zone Cooling Set-point=24.00
   **   ~~~   ** Zone TempDepZnLd=NAN
   **   ~~~   ** Zone TempIndZnLd=NAN
   **   ~~~   ** Zone ThermostatSetPoint=0.00
   **   ~~~   ** Zone HeatingSetPointOffset=0.00
   **   ~~~   ** Zone CoolingSetPointOffset=0.00
   **  Fatal  ** Program terminates due to above conditions.

Regards
Ali


__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___