Are you using V8? V8.0.0.008? (as there was a problem).
Note that if you report out hourly values for electric equipment these will be averaged over the hour -- if you want to exactly match your inputs, you might be better off using timestep outputs.
Please send your input file and schedule file to the helpdesk, if the above does not solve the problem.
At 10:56 AM 6/10/2013, simplesipper wrote:
I created a simple CSV file with fractional hourly values. I created a full 8760 hours worth, saved the CSV file locally on my Windows 7 machine, and then referenced this file in EnergyPlus, in a Schedule:File definition.
After running the simulation, when I compare the output hourly fractional values to the CSV file, I find what look like EnergyPlus random insertions, and sometimes deletions, which cause the output not to match the input.
__._,_.___