Hi David. Look at the run simulations parameters. Change to " no" the run simulation for design periods.
Oscar
Hi there,
I'm very new to EnergyPlus and am trying to do a very basic model of a one-zone house for the months of February and July, profiled four times an hour, with outputs such as temperature, sensible heating/cooling etc. For some reason, however, I can only get the program to produce hourly data for my two designated Design Days in February and July (rather than for both whole months).I am using Version 7.0 of EnergyPlus. I have defined the Timestep to be 4, the RunPeriod to be for the months of February and July and I have also designed two Design Days as 21 February and 21 July.I just can't figure out why it will only produce data for the Design Days. Is there anywhere else I need to tell the program that it should be profiling for the RunPeriod? I'm also not really sure why I need the Design Days designated, but the program won't run without these definitions.If anyone has any ideas to help me, I would really appreciate it!Thanks very much,Dave
__._,_.___
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe
__,_._,___