[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [EnergyPlus_Support] ASHRAE 90.1 Appendix G Baseline HVAC Systems





I have it on pretty good authority that the plant equipment are common for the whole building.


2014-07-28 12:39 GMT+02:00 seanking.1970@xxxxxxxxxxx [EnergyPlus_Support] <EnergyPlus_Support@xxxxxxxxxxxxxxx>:
 

Dear all,


In App G (I am using 2007 version), section "G3.1.1 Baseline HVAC System Type and Description", it says "For systems 1, 2, 3 and 4, each thermal block shall be modeled with its own HVAC system. For systems 5, 6, 7 and 8, each floor shall be modeled with a separate HVAC system."


Does anybody have an idea how to understand it?


It seems only system no. 2 is clear to me, each thermal zone should install this PTHP for the specific zone.


Systems 1, 3 and 4 might just require air system to be its own (system no.1 uses 1 boiler for whole lot of thermal zones, systems 3 and 4 use 1 rooftop unit for whole lot of thermal zones)? Really not sure about this.


The similar question on systems 5, 6, 7 and 8: each floor needs its own rooftop unit (but this seems to make sense)?


Welcome to any answers.


Best regards,


Sean




__._,_.___

Posted by: Jean Marais <jeannieboef@xxxxxxxxx>


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Visit Your Group
Yahoo! Groups
PrivacyUnsubscribeTerms of Use

__,_._,___