[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[EnergyPlus_Support] ASHRAE 90.1 Appendix G Baseline HVAC Systems





Dear all,


In App G (I am using 2007 version), section "G3.1.1 Baseline HVAC System Type and Description", it says "For systems 1, 2, 3 and 4, each thermal block shall be modeled with its own HVAC system. For systems 5, 6, 7 and 8, each floor shall be modeled with a separate HVAC system."


Does anybody have an idea how to understand it?


It seems only system no. 2 is clear to me, each thermal zone should install this PTHP for the specific zone.


Systems 1, 3 and 4 might just require air system to be its own (system no.1 uses 1 boiler for whole lot of thermal zones, systems 3 and 4 use 1 rooftop unit for whole lot of thermal zones)? Really not sure about this.


The similar question on systems 5, 6, 7 and 8: each floor needs its own rooftop unit (but this seems to make sense)?


Welcome to any answers.


Best regards,


Sean



__._,_.___

Posted by: seanking.1970@xxxxxxxxxxx


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Visit Your Group
Yahoo! Groups
• Privacy • Unsubscribe • Terms of Use

__,_._,___