[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[EnergyPlus_Support] Swiming Pools schedules





I am modelling swimming pool application with dehumidification AHU with integrated heatpump (evaporator is in extract).

I just started and face a problem of schedules for occupancy and lighting. Constructions for the envelope I am going to take standard 90.1 for my climate zone and after that offset the insulation width it in order to get proper inner surface temperature (> air DP).

 

Please share schedules of occupancy and interior lighting or advice where can I get it.

 

Thank you.

 

ARTEM ZHUKOV | HVAC/Mechanical Engineer | HVAC TPM | Energy Engineer | Building Physics Specialist | Sustainability Engineer | M: +420 774 081 898 | View LinkedIn profile | Web Cal

 



__._,_.___

Posted by: "Artem Zhukov" <green.azhukov@xxxxxxxxx>


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.





__,_._,___