Thanks so much, Aaron.
I'll take a look in more detail shortly, but I see that one of the projects was in my backyard in Kalamazoo!

On Wed, Feb 4, 2015 at 9:12 AM, 'Dahlstrom, Aaron' ADahlstrom@xxxxxxxxxxxx [EnergyPlus_Support] <EnergyPlus_Support@xxxxxxxxxxxxxxx> wrote:
 

Jim ?

 

We looked into this for a distribution center model a few years back.

As we had electric charging, we wanted to characterize the energy use of a bank of roughly 200 charging stations â?? so we were concerned both with the heat load and with the electric draw.

 

Attached were some of the resources we found.

The electric lift truck manufacturersâ?? guidance helped quantify the total kWh of the battery system, per charge / discharge cycle.

The PGE report on lift truck chargers gave us insight into the inefficiencies of the charging process, and the waste heat / vampire load from the charger when not in charge mode.

We consulted with the client to determine the number of charge / discharge cycles per charger per day.

 

For our heavily-used distribution center, we estimated that electric charging was a significant portion of the buildingâ??s energy cost (greater than 20%).

 

Aaron

 

Aaron Dahlstrom, PE, LEED® AP

In Posse ? A subsidiary oof AKF| 1500 Walnut Street, Suite 1414, Philadelphia, PA 19102

d: 215-282-6753| m: 267-507-5470| In Posse: 215-282-6800| AKF: 212-354-5656

e: ADahlstrom@xxxxxxxxxxxx | in posse web: www.in-posse.com | akf web: www.akfgroup.com

 

From: EnergyPlus_Support@xxxxxxxxxxxxxxx [mailto:EnergyPlus_Support@xxxxxxxxxxxxxxx]
Sent: Monday, February 02, 2015 9:59 AM
To: EnergyPlus_Support@xxxxxxxxxxxxxxx
Subject: Re: [EnergyPlus_Support] Lift truck energy expressed as an internal load

 

 

Dru,

That's a valuable insight (impact of charging the lift trucks on demand cost).  The report itself is very interesting; I skimmed it and will read it more thoughtfully a bit later.

I will talk to Mike Deru or another of the authors, bit I'm still hoping that others also contribute their knowledge.

 

On Mon, Feb 2, 2015 at 9:28 AM, Dru Crawley dbcrawley@xxxxxxxxx [EnergyPlus_Support] <EnergyPlus_Support@xxxxxxxxxxxxxxx> wrote:

 

Jim,

 

When NREL was working on a low-energy building in Colorado, they found they needed to schedule the charger on the forklift -- or it set the peak demand for the building.  Here's a link to the report:  http://www.nrel.gov/docs/fy05osti/34930.pdf  I'm sure the authors could provide more insights.

 

Dru

 

On Mon, Feb 2, 2015 at 8:54 AM, Jim Dirkes jim@xxxxxxxxxxxxxxxxxxxxxxxxxxx [EnergyPlus_Support] <EnergyPlus_Support@xxxxxxxxxxxxxxx> wrote:

 

Dear Forum,

For the first time, it occurs to me that a lift truck used to transport materials inside of a warehouse constitutes an internal load; the work that it does becomes heat inside the warehouse.  This is true for propane and electrical lift trucks; all energy becomes heat eventually.

While it is probably a small load, I am interested in determining its magnitude.  Have any of you attempted to quantify it?  or have reference materials which do so?

Thanks in advance.

 

--

James V Dirkes II, PE, BEMP, LEED AP
CEO/President
The Building Performance Team Inc.
1631 Acacia Dr, GR, Mi 49504

Direct: 616.450.8653
jim@xxxxxxxxxxxxxxxxxxxxxxxxxxx

Website l  LinkedIn

The truth is like a lion; you donâ??t have to defend it. Let it loose; it will defend itself.

 



 

--

James V Dirkes II, PE, BEMP, LEED AP
CEO/President
The Building Performance Team Inc.
1631 Acacia Dr, GR, Mi 49504

Direct: 616.450.8653
jim@xxxxxxxxxxxxxxxxxxxxxxxxxxx

Website l  LinkedIn

The truth is like a lion; you donâ??t have to defend it. Let it loose; it will defend itself.

This e-mail may contain information that is confidential, privileged or otherwise protected from disclosure. If you are not an intended recipient of this e-mail, do not duplicate or redistribute it by any means. Please delete it and any attachments and notify the sender that you have received it in error. Unintended recipients are prohibited from taking action on the basis of information in this e-mail. E-mail messages may contain computer viruses or other defects, may not be accurately replicated on other systems, or may be intercepted, deleted or interfered without the knowledge of the sender or the intended recipient. If you are not comfortable with the risks associated with e-mail messages, you may decide not to use e-mail to communicate with In Posse.




--

James V Dirkes II, PE, BEMP, LEED AP
CEO/President
The Building Performance Team Inc.
1631 Acacia Dr, GR, Mi 49504

Direct: 616.450.8653
jim@xxxxxxxxxxxxxxxxxxxxxxxxxxx

Website l  LinkedIn

The truth is like a lion; you donâ??t have to defend it. Let it loose; it will defend itself.



__._,_.___

Posted by: Jim Dirkes <jim@xxxxxxxxxxxxxxxxxxxxxxxxxxx>


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Visit Your Group
Yahoo! Groups
PrivacyUnsubscribeTerms of Use

__,_._,___