Are you using v8.3? I'm pretty sure that I ran a 3-ply glazing with blind on the outermost gap not too long ago without error. DesignBuilder was automatically putting the blind in the inner most gap so I changed it in the idf and ran it...it could have been 4-ply, I don't remember. Another route may be to use the WINDOW program for your build-up, note the results and then create an equivalent assembly with 2-ply as you did with the LBL method. If the assembly is equivalent then the effects of the low-e coating is therein contained, so I don't see it as an issue. Mit freundlichen Grü�en- Sent from my iPhone (excuse the brevity) i. A. Jean Marais b.i.g. bechtold Tel. +49 30 6706662-23 On 12.05.2015, at 12:27, "adlou92bis@xxxxxxxxx [EnergyPlus_Support]" <EnergyPlus_Support@xxxxxxxxxxxxxxx> wrote:
__._,_.___ Posted by: "jeannieboef@xxxxxxxxx" <jeannieboef@xxxxxxxxx> Primary EnergyPlus support is found at: http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx The primary EnergyPlus web site is found at: http://www.energyplus.gov The group web site is: http://groups.yahoo.com/group/EnergyPlus_Support/ Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files. EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button. __,_._,___ |