[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[EnergyPlus_Support] DX Coil Runtime fraction





Whenever the DX cooling coil, two speed starts to operate there is a power surge. My timestep is 1 minute and I observe that for the first timestep, the DX coil runtime fraction is 1 which is due to the compressor running for longer duration (full 1 minute) to meet the cycling losses.
For each timestep, DX coil runtime fraction after the first minute is less than 1 e.g. 0.82. What does this mean? The compressor is cycling during each timestep of 60secs?


__._,_.___

Posted by: Fakeha Sehar <fakeha_s@xxxxxxxxx>


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Visit Your Group
Yahoo! Groups
• Privacy • Unsubscribe • Terms of Use

__,_._,___