[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [EnergyPlus_Support] Too much Simulation Time





Loosening up your relaxation factor could work too. 

Since you have PCM only in the roof,  you should only use FD on that construction or surface and then your 90 surfaces should not be a problem. 

Sent from my iPhone

On May 26, 2016, at 8:18 AM, Dru Crawley dbcrawley@xxxxxxxxx [EnergyPlus_Support] <EnergyPlus_Support@xxxxxxxxxxxxxxx> wrote:

 

Reduce the number of surfaces.. with the PCM and FD methods, that will help.

On Thu, May 26, 2016 at 5:18 AM, gauravciitr@xxxxxxxxx [EnergyPlus_Support] <EnergyPlus_Support@xxxxxxxxxxxxxxx> wrote:
 

Hi,

I am running E+(ver 8.4) simulation on a building with

1. Building area: 117 sqm

2. Conditioned volume: 360 m3

3. PCM on roof: 90 sqm

4. Number of surfaces: 90

5. Conduction finite difference method, so 20 timesteps

6. Each construction has some 7-8 layers


6. Laptop with 4 cores


Even for 1-month runtime it's taking more than 90 mins. Can anyone suggest how can I reduce simulation time. I know reducing the layers in construction is one, but I want to keep that solution the last one.




__._,_.___

Posted by: Jeremiah Crossett <jcrossett@xxxxxxxxxx>


EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The EnergyPlus web site is found at:
http://www.energyplus.net/

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the &quot;search&quot; button.





__,_._,___