[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [EnergyPlus_Support] outdoor air mehod: ProportionalControlBasedonOccupancySchedule





To produce the rdd file Julian mentioned, you must ask the simulation to do so by including the output text line in your idf. Exactly what that text line is, you'll have to search the documentation or this forum for rdd. 

On Fri, 27 Jul 2018, 19:54 Julien Marrec julien.marrec@xxxxxxxxx [EnergyPlus_Support], <EnergyPlus_Support@xxxxxxxxxxxxxxx> wrote:
 

Just open your eplusout.rdd after a successful run, and search for â??outdoor airâ??. You should find a variable for the airloophvacoutdoorairsystem (so airloophvac level, could serve multiple zone) and one for each thermal zone if thatâ??s the granularity you want.

?â???
Sent from a mobile device, please excuse the brevity.

Julien Marrec, EBCP, BPI MFBA
Owner
EffiBEM

Direct: +33 6 95 14 42 13
Website: www.effibem.com

LinkedIn (en) | (fr)


Le 26 juil. 2018 à 22:59, my_sunny_night@xxxxxxxxx [EnergyPlus_Support] <EnergyPlus_Support@xxxxxxxxxxxxxxx> a écrit :

 

Thanks again.



__._,_.___

Posted by: Jean Marais <jeannieboef@xxxxxxxxx>


EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The EnergyPlus web site is found at:
http://www.energyplus.net/

The group web site is:
http://groups..yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the &quot;search&quot; button.




Visit Your Group
Yahoo! Groups
PrivacyUnsubscribeTerms of Use

__,_._,___