[Equest-users] Workflow question - What is the best way to modelthe baseline case and then design case? LEED
Brahme, Rohini UTRC
BrahmeR at utrc.utc.com
Mon Dec 15 08:17:31 PST 2008
The way I have done it before is change the HVAC system and its
corresponding parameters in the parametric window. The zoning and the
number of systems remains the same.
-Rohini
From: equest-users-bounces at lists.onebuilding.org
[mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of James
Geers
Sent: Monday, December 15, 2008 11:07 AM
To: equest-users at lists.onebuilding.org
Subject: [Equest-users] Workflow question - What is the best way to
modelthe baseline case and then design case? LEED
I am modeling a building that has a Packaged VAV system as the base case
and a standard VAV system as the design case. Is there any easy way to
set up a second mechanical system and then reassign the zones to it as a
parametric run? I'm trying to avoid creating a second model so that I
can keep any adjustments to the schedule, loads or envelope identical.
I have investigated setting up dummy zones to assign the VAV mechanical
system to, but I can't figure out how to reassign the zones as a
parametric run. Thank you.
James F. Geers
Registered Architect
LEED Accredited Professional
SFA Architects
300 West Fourth Street
Cincinnati, Ohio 45202
513.721.0600
513.721.0611 (fax)
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20081215/b80f3c61/attachment-0001.htm>
More information about the Equest-users
mailing list