[Equest-users] Workflow question - What is the best way to modelthe baseline case and then design case? LEED

James Geers jgeers at sfa-architects.com
Mon Dec 15 08:29:32 PST 2008


I am trying the method of switching mechanical systems a parametric run, but
I still had to set up a dummy zone in order to create a chilled water loop.
I also have a hard time making sure I manually specify everyone of the
parameters I need without having the dialogue windows to fill in on the main
screen.  As an example, my VAV system is showing up as less efficient system
than the Packaged VAV because my pump and fan energies are much higher. I
fear I have missed the appropriate input because I assume my VAV would be
more efficient.

 

If there were a way to reassign the zones it would be ideal, other wise I
will have to modify the system.

 

 

James F. Geers

Registered Architect

LEED Accredited Professional

 

SFA Architects

300 West Fourth Street

Cincinnati, Ohio 45202

513.721.0600    

513.721.0611 (fax)

 

  _____  

From: Brahme, Rohini UTRC [mailto:BrahmeR at utrc.utc.com] 
Sent: Monday, December 15, 2008 11:18 AM
To: James Geers; equest-users at lists.onebuilding.org
Subject: RE: [Equest-users] Workflow question - What is the best way to
modelthe baseline case and then design case? LEED

 

The way I have done it before is change the HVAC system and its
corresponding parameters in the parametric window. The zoning and the number
of systems remains the same.

-Rohini

 

From: equest-users-bounces at lists.onebuilding.org
[mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of James Geers
Sent: Monday, December 15, 2008 11:07 AM
To: equest-users at lists.onebuilding.org
Subject: [Equest-users] Workflow question - What is the best way to modelthe
baseline case and then design case? LEED

 

I am modeling a building that has a Packaged VAV system as the base case and
a standard VAV system as the design case.  Is there any easy way to set up a
second mechanical system and then reassign the zones to it as a parametric
run?  I'm trying to avoid creating a second model so that I can keep any
adjustments to the schedule, loads or envelope identical.  I have
investigated setting up dummy zones to assign the VAV mechanical system to,
but I can't figure out how to reassign the zones as a parametric run.  Thank
you.

 

James F. Geers

Registered Architect

LEED Accredited Professional

 

SFA Architects

300 West Fourth Street

Cincinnati, Ohio 45202

513.721.0600    

513.721.0611 (fax)

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20081215/f970477b/attachment-0002.htm>


More information about the Equest-users mailing list