[Equest-users] results discrepancy between Rainbow report & DOE-2 BEPU report
Patrick J. O'Leary, Jr.
poleary1969 at gmail.com
Tue Jul 16 04:25:12 PDT 2013
so if you manually change the .csv file to match the .sim file, do the
rainbow reports reflect the data properly?
On 7/15/13 11:51 PM, Pasha Korber-Gonzalez wrote:
> Hi Nick & Patrick---I've checked the csv file and it is correct as you
> both have explained it. The csv file feeds the eQuest reports (not
> the .sim output file) & the csv file only picks up on the initial
> utility meters (i.e. EM1/FM1) and therefore the additional energy
> use/meters are not included or reported to the eQuest output reports
> (which I refer to as the Rainbow reports for utility usage and demand.)
>
> Therefore based on this finding/confirmation---it is imperative that I
> feed my client results directly from the DOE-2 .sim file output
> reports (ie BEPU/BEPS; PS-E) reports to offer the correct energy model
> output results. At this level of the model file when there are
> additional meter or energy production/consumption the standard eQuest
> output results reports/graphs do not translate the actual model results.
>
> Thanks so much guys for your insight & assistance!!
>
> Pasha
>
>
> On Mon, Jul 15, 2013 at 10:51 AM, Nick Caton <ncaton at smithboucher.com
> <mailto:ncaton at smithboucher.com>> wrote:
>
> Thanks Patrick, that falls in line with my recollections as well
> (I’m working from fuzzy memory!). Perhaps my suggestion is more
> accurately put that the CSV results file does not pick up on
> additional meters or energy generation, as may be occurring…
>
> Pasha, since this is fresh and in front of you, would you mind
> quickly checking/testing if this is the case for us all?
>
> Thanks!
>
> ~Nick
>
> cid:489575314 at 22072009-0ABB**
>
> **
>
> *NICK CATON, P.E.*
>
> SENIOR ENGINEER
>
> Smith & Boucher Engineers
>
> 25501 west valley parkway, suite 200
>
> olathe, ks 66061
>
> direct 913.344.0036 <tel:913.344.0036>
>
> fax 913.345.0617 <tel:913.345.0617>
>
> www.smithboucher.com <http://www.smithboucher.com>__
>
> *From:*Patrick J. O'Leary, Jr. [mailto:poleary1969 at gmail.com
> <mailto:poleary1969 at gmail.com>]
> *Sent:* Monday, July 15, 2013 11:47 AM
> *To:* Nick Caton
> *Cc:* Pasha Korber-Gonzalez; eQUEST Users List
> *Subject:* Re: [Equest-users] results discrepancy between Rainbow
> report & DOE-2 BEPU report
>
> the 'rainbow' reports actually pull their data from a separate csv
> format file named "project name - baseline design_EG_MoEU_ED.csv",
> not from the .sim file.
>
> you could, in theory, edit the .csv file to make the numbers
> match. i haven't tried doing so but since it is only a csv file
> you'd have to change it every time you run the simulation.
>
> On 7/15/13 9:21 AM, Nick Caton wrote:
>
> I *believe* the “rainbow” graphical reports are specific to _only_
> the EM1/FM1 default meters, and if you have included anything else
> in the way of sub-meters or separate utility rate metering that
> may not show up in these numbers (but will in the BEPU and other
> SIM reports).
>
> For this reason, as a matter of course I have moved away from
> using the graphical reports and opt to use the PSE reports instead
> when assembling enduse consumption/demand documentation for LEED
> and similar levels of scrutiny – just to avoid such potential
> trip-ups. The graphical reports are still great and useful, but
> it’s good to be aware of what they might not be showing!
>
> ~Nick
>
> cid:489575314 at 22072009-0ABB
>
> **
>
> *NICK CATON, P.E.*
>
> SENIOR ENGINEER
>
> Smith & Boucher Engineers
>
> 25501 west valley parkway, suite 200
>
> olathe, ks 66061
>
> direct 913.344.0036 <tel:913.344.0036>
>
> fax 913.345.0617 <tel:913.345.0617>
>
> www.smithboucher.com <http://www.smithboucher.com>__
>
> *From:*equest-users-bounces at lists.onebuilding.org
> <mailto:equest-users-bounces at lists.onebuilding.org>
> [mailto:equest-users-bounces at lists.onebuilding.org] *On Behalf Of
> *Pasha Korber-Gonzalez
> *Sent:* Monday, July 15, 2013 10:33 AM
> *To:* eQUEST Users List
> *Subject:* [Equest-users] results discrepancy between Rainbow
> report & DOE-2 BEPU report
>
> Hi fellow modelers; I've run into something funny this past
> couple days. On a couple of my simulations I've noticed that the
> results numbers in the eQuest Rainbow report are slightly higher
> (approx 10%) than the output results in my DOE-2 BEPU report.
>
> I've never observed this happening before--has anyone else?
>
> Any thoughts and comments are welcomed!
>
> Thanks,
>
> Pasha
>
> Korber Energy Consultants
>
> www.korberenergy.com <http://www.korberenergy.com>
>
>
>
>
> _______________________________________________
>
> Equest-users mailing list
>
> http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org
>
> To unsubscribe from this mailing list send a blank message toEQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG <mailto:EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG>
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20130716/30a42bc7/attachment-0002.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/jpeg
Size: 1459 bytes
Desc: not available
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20130716/30a42bc7/attachment-0002.jpeg>
More information about the Equest-users
mailing list