Mike,
do you already know when the next release version
1.0.3 will be available?
By the way, the effects of non-steady loads you
also can get for zone sizing calculations. But I assume this is the same
bug as for design day calculations.
Clemens
--
Dr.-Ing. Clemens Felsmann Institut für Thermodynamik und TGA der TU
Dresden Tel.: 0351/463 3 5177 Fax: 0351/463 3 7888 mail: felsmann@xxxxxxxxxxxxxxxxx
----- Original Message -----
Sent: Friday, November 08, 2002 5:58
PM
Subject: Re: [EnergyPlus_Support]
Heating/Cooling Load
Thanks to Clemens' persistence, a bug has been
found related to the load convergence criteria during the warmup
period. This is causing the warmup period to exit too early.
The case described below was exiting after only three warmup days, which
was too soon for this heavy construction. This resulted in unsteady
conditions during the steady-state design day. The bug has been
fixed for the next release, version 1.0.3.
This bug may impact the
results of short-term simulations with heavy constructions. For
lighter weight buildings and for annual simulations, the overall impact on
results should be very
small.
Mike
To unsubscribe from this group, send an email to:
EnergyPlus_Support-unsubscribe@xxxxxxxxxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Your use of Yahoo! Groups is subject to the Yahoo! Terms of Service.
|