[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [EnergyPlus_Support] Chiller Branch Issue





I didn't look into the file in detail but it looks like you don't have to change any other node names.
Simply make the 1 line change as attached and the file will run. Attached is the modified file and error file.

On 8/10/2012 4:50 PM, Jeremiah Crossett wrote:
 

Thanks- that seemed to have worked- I changed the name of the input node at the chiller to match the branch, and changed the name of the output node at the ice storage to match the chiller made since and the file ran, (I also tried to change the name of the branch to match the chiller but that caused a fatal error) So now I have a file that runs but now I get a new severe error and some warnings that I am not sure how to approach- Any advise?


  ** Severe  ** Node Connection Error, Node="CHILLER CHW INLET NODE", The same node appears as a non-parent Outlet node more than once.
   **   ~~~   ** Reference Object=CONNECTOR:SPLITTER, Name=CHW LOOP SUPPLY SPLITTER
   **   ~~~   ** Reference Object=THERMALSTORAGE:ICE:DETAILED, Name=ICE TANK
   ** Warning ** Potential Node Connection Error for object THERMALSTORAGE:ICE:DETAILED, name=ICE TANK
   **   ~~~   **   Node Types are still UNDEFINED -- See Branch/Node Details file for further information
   **   ~~~   **   Inlet Node : CHW LOOP SUPPLY PUMP OUTLET NODE
   **   ~~~   **   Outlet Node: ICE TANK OUTLET
   ** Warning ** Node Connection Error for object THERMALSTORAGE:ICE:DETAILED, name=ICE TANK
   **   ~~~   **   Chilled Water Nodes not on any Branch or Parent Object
   **   ~~~   **   Inlet Node : CHW LOOP SUPPLY PUMP OUTLET NODE
   **   ~~~   **   Outlet Node: CHILLER CHW INLET NODE
   ************* There were 3 node connection errors noted.
   ************* Beginning Simulation
   ** Warning ** PlantSupplySide: PlantLoop="CHW LOOP", Error (CheckLoopExitNode) -- Mass Flow Rate Calculation. Outlet and Inlet differ by more than tolerance.
   **   ~~~   **  Environment=CENTRAL STATES INDUSTRIAL, at Simulation time=01/01 11:04 - 11:05
   **   ~~~   ** Loop inlet node=CHW LOOP SUPPLY SIDE INLET, flowrate=9.0517 kg/s
   **   ~~~   ** Loop outlet node=CHW LOOP SUPPLY SIDE OUTLET, flowrate=18.1033 kg/s
   **   ~~~   ** This loop might be helped by a bypass.


Jeremiah D. Crossett  | Senior Analyst  |  Phase Change Energy Solutions
120 E. Pritchard St.  | Asheboro, NC 27203  | Mobile 503-688-8951
 

  






On Fri, Aug 10, 2012 at 1:24 PM, Chandan Sharma <csharma@xxxxxxxxxxxx> wrote:
 

Chiller has two different inlet node names "Chiller CHW Inlet Node" and "Ice Tank Outlet" in two separate places. Correcting the node name in the chiller object should make this file to run.



On 8/10/2012 4:09 PM, Jeremiah Crossett wrote:
 
I finally seem to have gotten the ice storage object to work but now it says my chiller is missing- When attempting to re-connect the chiller in any logical way I can think of I get fatal errors saying that I have duplicate node names. I put the day into this yesterday, read documentation and ran experiments and seem to have not gotten the detailed ice storage object to work- but in the process have apparently disconnected my chiller.  Can anyone help? Dr Li, your previous advise was over complicated I see not reason to make a refrigerated room when the goal is to cold charge a PCM in the night to use it in the day to pre-cool input for a chiller for a non refrigerated space. 

 
** Severe  ** Plant Component Chiller:Electric:EIR called "CHILLER" was not found on any plant loops.
   **   ~~~   ** Looking for matching inlet Node="ICE TANK OUTLET".
   **  Fatal  ** InitElectricEIRChiller: Program terminated due to previous condition(s).
   ...Summary of Errors that led to program termination:
   ..... Reference severe error count=1
   ..... Last severe error=Plant Component Chiller:Electric:EIR called "CHILLER" was not found on any plant loops.

  This project in particular is to use BioPCM Thermastix, (see image below) in a container to absorb cold and use it for chiller pre-cooling- basically as a replacement for ice in an ice storage type setup- seems perfect for Energy Plus Ice Storage Detailed object as it allows the "ice" to melt at a user specified temperature, and as manufactures we can make our PCM-ICE to melt at any temperature-- but the question is what temperature and how much to use, both questions it would be great if Energy Plus could answer- if only I could get the object to work.. I have been trying on and off for days- so any help would be appreciated. 





Jeremiah D. Crossett  | Senior Analyst  |  Phase Change Energy Solutions
120 E. Pritchard St.  | Asheboro, NC 27203  | Mobile 503-688-8951
 

  









__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___
Attachment not found:
d:\eudora\attach\BioPCM-ICEstorage1.err
Attachment not found:
d:\eudora\attach\BioPCM-ICEstorage1.idf