Dear EnergyPlus
usersx
I was
wondering if it is possible to increase the timestep in EnergyPlus to 120 (or
even 360) times per hour instead of 60 times per hour? I would need this to
establish a connection between EnergyPlus and Matlab Simulink. I tried to change
the maximum value of the timestep by setting it to 360 in the idd file. The
result was that EnergyPlus calculated the system 4 times per hour, instead of every
30 seconds or every 10 seconds. Could someone please tell me if it is possible
to implement a shorter timestep and how it could be done? Thank you in advance.
Charlotte Goovaerts