ÂJonathan,I have not reviewed your IDF in detail, but here are some ideas:
- I'm guessing that because you've set the Pool Heating System Maximum Water Flow Rate = 0, that no pool heating occurs.
- I have not used the (relatively) new indoor Pool object in E+, but E+ needs to know at least a couple of things in order to calculate pool heating energy
- a peak evaporation rate andÂ
- a schedule for diversity of the evaporation (e.g., active vs. inactive periods in the pool)
- Since evaporation represents a heat loss equivalent to ~950 BTU/hr, the load on the pool heater is the product of the peak rate and the diversity fraction.
- If you have a dehumidification system, the evaporation is also a latent load for your dehumidification system. This can be represented with an OtherEquipment object, as shown below (but may be included in some fashion by the Indoor Pool object).
- If you want to get more detailed, and assuming the pool is built into the ground, you might also consider defining the pool as a "basement" zone with walls of the same material as the pool sub-surface walls and a heating system which maintains that zone at the pool's water temperature
I hope this helps.On Sun, Nov 8, 2015 at 6:18 AM, jduverge1979@xxxxxxxxxxxx [EnergyPlus_Support] <EnergyPlus_Support@xxxxxxxxxxxxxxx> wrote:ÂCan anybody have a lot at what I'm doing wrong.
I am simulating an indoor swimming pool. I manage to get the project to simulate. However i cannot get the pool water temperature to 29 degree. And also there is no pool water heating rate. I thought maybe i have not properly identify the swimming pool (vertex). I compared mine to the swimming pool example provide 5Zoneswimming pool. In the example , the vertex use to reflect the surface of the swimming pool does not seems right as well.
I have attached the result spreadsheet and the idf file.
Can somebody please help
Regards
Jonathan
--James V Dirkes II, PE, BEMP, LEED AP
CEO/President
The Building Performance Team Inc.
1631 Acacia Dr, GR, Mi 49504
Direct: 616.450.8653
jim@xxxxxxxxxxxxxxxxxxxxxxxxxxx
Website l  LinkedIn
We will forever be crippled if we let emotion or unexamined reactions govern our thoughts and actions.Â
--James V Dirkes II, PE, BEMP, LEED AP
CEO/President
The Building Performance Team Inc.
1631 Acacia Dr, GR, Mi 49504
Direct: 616.450.8653
jim@xxxxxxxxxxxxxxxxxxxxxxxxxxx
Website l  LinkedIn
We will forever be crippled if we let emotion or unexamined reactions govern our thoughts and actions.Â
__._,_.___